10-15 April 2011
iThemba LABS
Africa/Johannesburg timezone
Abstracts are now invited

Organizational Structures at GSI Concerning Accelerator Maintenance and Reliability

Not scheduled
Auditorium (iThemba LABS)

Auditorium

iThemba LABS

P O Box 722 Somerset West 7129
Oral

Description

The GSI Helmholtz Center for Heavy Ion Research GmbH at Darmstadt, Germany, operates three accelerators, the main linac UNILAC (UNIversal Linear ACcelerator) with two injectors (high current injector HSI, high charge state injector HLI), the heavy ion synchrotron SIS18 and the experimental storage ring ESR. Due to a time-sharing mode up to five experiments can be performed in parallel. Thus, the total experimental beam time per year varied from 11900 to 15500 hours during the last 5 years. To manage beam time scheduling, commissioning, breakdown events, maintenance, and shutdown periods a dedicated organizational structure has been developed for many years. It comprises several daily, weekly and long term meetings as well as responsible persons for beam time, machine, and shutdown coordination, and for safety issues. The operation crew is supported by call on duty personnel of each technical department. Within this contribution this organizational structure is presented in more details with respect to maintenance and reliability.

Primary author

Dr Wolfgang Bayer (GSI Helmholtz Center for Heavy Ion Research GmbH, Darmstadt, Germany)

Co-authors

Petra Schuett (GSI Helmholtz Center for Heavy Ion Research GmbH, Darmstadt, Germany) Mr Uwe Scheeler (GSI Helmholtz Center for Heavy Ion Research GmbH, Darmstadt, Germany)

Presentation Materials

There are no materials yet.