10-15 April 2011
iThemba LABS
Africa/Johannesburg timezone
Abstracts are now invited

TWO YEARS OPERATION AND RELIABILITY OF SSRF

Not scheduled
Auditorium (iThemba LABS)

Auditorium

iThemba LABS

P O Box 722 Somerset West 7129
Oral

Speaker

Dr Lixin Yin (Shanghai Institute of Applied Physics)

Description

SSRF, a 3.5GeV, 3.9nm.rad synchrotron light source, has been operated for users since May, 2009. The accelerator was operated in decay mode with machine availability of 95.7% and MTBF of 40hours. Most of the beam downs are triggered by the interlock in the super-conducting RF system. The main contribution to the MDT is the failure of LHe cryogenic system. The power supply system for magnets and the beam diagnostic system also influence the MTBF in operation. The top-up operation mode is being commissioned to increase the beam orbit stability. The reliability of injector will be upgraded to ensure the top-up operation mode opened for users. The detail operation performance, the main faults and the solutions are described in this paper.

Primary author

Dr Lixin Yin (Shanghai Institute of Applied Physics)

Co-author

Dr Wenzhi Zhang (Shanghai Institute of Applied Physics)

Presentation Materials

There are no materials yet.