18-22 May 2026
NRF-iThemba LABS, Old Faure Road, Cape Town
Africa/Johannesburg timezone

Development and Optimisation of a Two-Stage SiPM-Based Compton Camera

Not scheduled
20m
Auditorium (NRF-iThemba LABS, Old Faure Road, Cape Town)

Auditorium

NRF-iThemba LABS, Old Faure Road, Cape Town

NRF-iThemba LABS Old Faure Road Cape Town GPS Co-ordinates 34.025°S 18.716°E
Oral Environmental Measurements

Speaker

Shanyn Hart (iThemba LABS)

Description

This work investigates the development of a two-stage Compton camera for environmental radiation monitoring, with a focus on energy resolution, detection efficiency, fast timing, and optimal geometrical configuration. While significant advances have been made in radiation imaging technologies, challenges remain in achieving high sensitivity and accurate source localisation in complex environments.

A prototype Compton camera is studied using compact, low-voltage 14 × 14 × 25.4 mm LaBr$_3$:Ce scintillation detectors coupled to SiPM readout, with the aim of leveraging the advantages of modern SiPM technology. These detectors, manufactured by CapeScint (MA, USA), demonstrate excellent energy resolution (3.4% at 662 keV) and fast timing performance. Scatter event tracking is modelled using the TOPAS Monte Carlo toolkit to determine optimal detector geometry and timing characteristics, complemented by experimental measurements with standard gamma-ray sources.

In addition, two Cs$_2$LiYCl$_6$ (CLYC-6) SiPM-readout detectors of the same geometry have been commissioned to exploit their neutron sensitivity. Pulse shape discrimination is used to distinguish neutron and gamma-ray interactions, enabling simultaneous gamma–neutron detection for comprehensive environmental radiation assessment.

The development of this system has the potential to improve radiation source localisation, contamination mapping, and situational awareness in environmental and nuclear safety applications. Its compact design and fast-timing capabilities make it well suited for field deployment in scenarios such as nuclear facility monitoring, waste management, and emergency response. Preliminary results from simulation and experimental studies will be presented.

Primary authors

Shanyn Hart (iThemba LABS) Luna Pellegri (University of the Witwatersrand and iThemba LABS) Dr Pete Jones (iThemba LABS) Christo van Tubbergh (iThemba Labs) Steve Peterson (University of Cape Town)

Presentation Materials

There are no materials yet.