4-9 December 2022
Kruger Gate Hotel , At The Paul Kruger Gate, R536, Skukuza +27137355671
Africa/Johannesburg timezone
We have now passed the cancellation period for Accommodation at the Kruger Gate Hotel. Please be advised that the Kruger Gate Hotel cannot accept anymore cancellations

Operation and performance of the ATLAS TileCal ALTI system and test-beam results

Not scheduled
20m
Kruger Gate Hotel , At The Paul Kruger Gate, R536, Skukuza +27137355671

Kruger Gate Hotel , At The Paul Kruger Gate, R536, Skukuza +27137355671

Kruger National Park, On The Sabi River At The Paul Kruger Gate R536, Skukuza, 1350
Oral

Speaker

Humphry Tlou (University of the Witwatersrand)

Description

The Timing, Trigger and Control (TTC) system of the ATLAS Tile Calorimeter has be replaced for the Run 3 data-taking period. A new TTC interface module, the ATLAS Local Trigger Interface (ALTI) has been integrated and commissioned as part of the Phase-I upgrades. The ALTI module participated in the first Run 3 stable beam collisions (July 2022), recording events at $\sqrt{s}$ = 13.6 TeV. The TileCal test-beam TTC system is also being upgraded to use the ALTI module. The test-beam setup is equipped with upgraded electronics for the High Luminosity LHC. The ALTI module will be used for data-taking during the November 2022 test-beam campaign. We present the current status and the first test-beam results with the ALTI module.

Primary author

Humphry Tlou (University of the Witwatersrand)

Co-author

Bruce Mellado (University of the Witwatersrand and iThemba LABS)

Presentation Materials

There are no materials yet.